EMERGENCY DEMOLITION

BADALONA, BARRI DE LA SALUT

Emergency work to carry out the manual deconstruction of a building located in the district of La Salut of Badalona due to the structural pathologies of the own building and in front of the danger of collapse of the entire building. The work was done manually, as much of the personal belongings of the neighbors had to be recovered.

La Salut (5)

A brigade of workers came in floor by floor to retrieve everything they could and stored it in labeled containers. Once the floors were empty, the beams and slabs were dismantled with large cranes that held them and lowered them to the area prepared for the collection of materials. Once the slabs were dismantled, partitions and walls were dismantled manually, preventing them from falling onto the public road.

Execution period (months)
Year of realization
Award budget (euros)

THE PROJECT IN IMAGES

WANT MORE INFORMATION?

Contact our unit specializing in demolition and deconstruction