We are demolishing a building in the center of Esparreguera

Obres i Serveis Roig SA has begun demolition work on the building located at number 3 Hospital Street. It is a two-story building located on a pedestrian street in the center of the town, a few meters from the City Hall. The work will be completed in six months.

During this period, the access to Plaça Pitango and the side ramp on Carrer de Baix will remain open as normal, allowing access to the indoor swimming pool and the upper part of the square. However, the lower part of Plaça del Centre, recently renovated with a new play area, as well as the access via Carrer de Baix, will be closed during the working day. From five in the afternoon, they will reopen as normal, facilitating the use of the square just when children leave school.

This action will allow the entrance to the Plaza del Centre to be widened and also remodel the space to create a climate shelter, with shaded areas provided by two pergolas and spaces for rest.

(Photo: Esparreguera Town Hall)

Several local media outlets have reported on the start of the demolition work:

Esparreguera Town Hall

Radio Esparreguera

Esparreguera